Our Work
Real buildings.
Real numbers.
Every project here has documented results — not estimates. Office, healthcare, education, multifamily, industrial. Across Dallas–Fort Worth.
Uptown Office Tower
Full BAS installation across 14 floors. Replaced legacy pneumatic controls with modern DDC on Distech/Niagara platform, reducing HVAC energy by 34% in year one.
Richardson Tech Campus
Retro-commissioning on a 12-year-old Siemens system. Found 22 critical faults, corrected 60+ setpoints. Documented $180K in annual savings.
Frisco Luxury Residential
New BAS installation for 320-unit luxury complex. Central plant controls, unit ventilation, and common area systems on a single Niagara supervisory platform.
Irving Distribution Center
24/7 monitoring and operations on existing JCI Metasys installation. Fault detection identified a failed economizer damper saving $22K in one quarter.
Plano Medical Office
Retro-commissioning on Trane Tracer system. Corrected sequencing issues running AHUs in simultaneous heating/cooling for 3 years. Pressure relationships brought into compliance.
Fort Worth Logistics Hub
Full BAS design and installation for new-construction logistics facility. Dock door integration, lighting control, and compressed air monitoring on a unified platform.
Allen ISD Administration
LEED Enhanced Commissioning for new administration building. EAc1 documentation, functional performance testing, and post-occupancy verification.
Las Colinas Mixed-Use
Multi-system integration project: merged three separate BAS installations (JCI, Siemens, Trane) onto a single Niagara N4 supervisory platform for unified operations.
McKinney Senior Living
New BAS installation with infection control sequencing, 24/7 uptime requirements, and emergency generator monitoring. Honeywell EBI platform with Niagara integration layer.
Featured Case Study
Richardson Tech Campus
The Challenge
A 240,000 SF multi-tenant office campus had a Siemens BAS installed in 2011 that had never been formally commissioned. Tenants complained constantly about comfort. Utility bills had increased 18% over three years. The property manager assumed the system needed full replacement — a $900K capital expense.
What We Did
We started with a full system audit — pulling 90 days of trend data, reviewing all sequences against original design documents, and walking every mechanical room. We found 22 critical faults: a cooling valve stuck at 70% for over a year, AHUs running simultaneous heating and cooling on 6 units, and occupancy schedules still set to construction defaults. No new hardware was needed. We corrected sequences, calibrated 34 sensors, updated all schedules, and enrolled the building in Oncor's demand response program.
Results
- ✓34% reduction in HVAC energy consumption
- ✓$180,000 in documented annual savings
- ✓Zero tenant comfort complaints in 6 months post-commissioning
- ✓14-month ROI on the full commissioning engagement
- ✓Property value increased by estimated $2.1M (at prevailing cap rates)
- ✓$900K capital replacement project avoided
“We were ready to write a check for a full system replacement. Perry Controls found the problems, fixed them in 6 weeks, and saved us more in year one than we were going to spend on new equipment. I wish we had called them three years ago.”
— Property Manager, Richardson Tech Campus
Featured Case Study
Las Colinas Mixed-Use
The Challenge
A 310,000 SF mixed-use development had grown over 10 years through three separate construction phases, each with a different BAS: Johnson Controls Metasys on floors 1–6, Siemens Desigo on floors 7–14, and a Trane Tracer system in the retail podium. Three separate operator workstations. Three separate alarm systems. No unified view of the building.
What We Did
We deployed a Tridium Niagara N4 supervisory layer as the integration hub. BACnet drivers connected to Metasys and Siemens; Modbus TCP bridging brought in Trane data. All three systems now surface to a single unified operator workstation with a common alarm model, shared trend database, and occupancy-based logic that coordinates HVAC across all three platforms simultaneously.
Results
- ✓Three BAS platforms unified under single Niagara N4 interface
- ✓Operations staff reduced from 3 workstations to 1
- ✓Cross-system demand response coordination enabled
- ✓17% reduction in energy use from unified scheduling logic
- ✓Emergency response time reduced from 22 minutes to under 4 minutes
“We had operators running between three screens to manage one building. Now it is one screen. The difference in response time alone made this project worth it — and the energy savings were a bonus we did not expect.”
— Director of Facilities, Las Colinas Mixed-Use